Click here to start trading
Start Trading with HY Markets
Click here to start trading with HY Markets

Monday, April 27, 2009

Part 6 - My Complete Curricular Vitae
















QUALIFICATIONS

Bachelor Engineering (Hons) Civil Engineering
Malaysia University Of Technology


PROFESSIONAL MEMBERSHIP

Graduate member of Board of Engineer Malaysia (BEM) 47613A


SKILLS

Software Skills

JPKenny in House Software (PIPECALC & PIPESPAN), AGA level 1-3, Staad Pro version 2004, Autopipe version 2004, Mathcad 2001i Reinforcement Concrete Sofware (ESTEEM version 2003), OFFPIPE, Autocad and Microsoft Office (Powerpoint, Excel, Word).

Communication Skills

Able to speak and write in Malay as well as English



CURRICULAR ACTIVITIES/SEMINAR/CONFERENCES

Participant in seminar on “Current Trends In Offshore Geotechnical Investigations” organized by Sapura Crest Petroleum Company (TL GeoSciences)

Participant in seminar on “Effective Communication in Workplace” organized by Ministry Of Human Resources Malaysia.

Participant in seminar on “Cone Penetration Testing In Geotechnical Practice” organized by The Institution Of Engineers Malaysia.

Participant in BEM mandatory course on “Codes Of Ethics” organized by The Institution Of
Engineers Malaysia.

Participant in BEM mandatory course on “Engineering Management Practice” organized by The Institution Of Engineers Malaysia.

Participant in BEM mandatory course on “Safety & Health at Work” organized by The Institution Of Engineers Malaysia.


Participant in training programme on “Defensive Driving Course” organized by The Automobile Association of Malaysia.

Participant in training programme on “ISO 9001:2000:ISO 14001:2004 & OSHAS 18001:2007 Internal Audit Training Programme” organized by TQS Management Sdn. Bhd..

Participant in training programme on “ISO 14001:2004 & OHSAS 18001:2007 Awareness Training Programme” organized by TQS Management Sdn. Bhd..



SUMMARY OF EXPERIENCES
A qualified Pipeline Engineer with 5 years experience in the oil & gas industry which are Involve in Pipeline Design (Offshore, Shore Approach and Onshore), Subsea Structures design (PLEM) with liaise Subsea Facilities, Offshore Foundation design for Single Point Mooring anchor. Also have experiences in offshore construction for pipeline installation and barge mobilization/demobilization. Have a good public relation skills where can deal and liaise with all level of person from clients, contractors and supplier/vendor.
Familiar with all the codes and standards related to pipeline and structure design such as Petronas Technical Standard (PTS), Shell Standards (DEP), DNV, ASME, API, ASTM and ISO.


EXPERIENCE

TL OFFSHORE SDN. BHD. (Subsidiaries of SAPURACREST PETROLEUM SDN. BHD.)
(August 2008 – Present)

Position : Pipeline Engineer

Project Involvement:

Murphy Sarawak Oil Co., Ltd. (Murphy) via TL Offshore SDN. BHD.
2010-2012 Transportation and Installation Of Offshore Facilities (Package C)
SARAWAK Gas Development Project
(Jan 2009 – Present)

Experience:
Involve in Pipelay Installation analysis using Enterprise 3 barge. Analysis provide for pipelines (20in SE-PA to GO-RA and 8in SE-PA to PLEM). Produce the Scope of work for Pipeline Detailed Design for Subcontract bidding (ITB)

PCPP OPERATING COMPANY via TL Offshore SDN. BHD.

2009 Transportation and Installation Of Offshore Facilities
D1 CLUSTER Development Project
(July 2009 - Dec 2009)

Experience:
Involve in Pipelay Installation analysis (Normal Lay, A&R, and Start-up) for all pipelines (10in FWS pipeline from Dana MOPU to PLEM and 16in FWS from D30 MOPU to D35R-A platform ). Analysis are based on Enterprise 3 and Lewek Champion barge.

Quippo Prakash Pte. Ltd. via TL Offshore SDN. BHD.

North Tapti Gas Field Development Project
(June 2009 – June 2009)

Experience:
Involve in prelim study of installation pipeline using QP 2000 barge with articulated stinger.

Petronas Carigali SDN. BHD. via TL Offshore SDN. BHD.
2009 Transportation and Installation Of Offshore Facilities
KUMANG CLUSTER Pipelines Project
(Jan 2009 - Sept 2009)

Experience:
Involve in Pipelay Installation analysis (Normal Lay, A&R, and Start-up) for all KUMANG FIELD pipelines (10in F9SS-1 – F9JT-A, 24in KASS-A – KAKG-A, 28in F9JT-A – KAKG-A, 18in KUJT-A – KAKG-A and 28in KAKG-A – MLNG-2). Analysis are based on Enterprise 3 and Lewek Champion barge. Scope of analysis also include Shore Approach region (Mid point tie-in, Beach Pull)

Petronas Carigali SDN. BHD. via TL Offshore SDN. BHD.
2009 Transportation and Installation Of Offshore Facilities
ENTERPRISE 3 Mobilization for Pipelines Installation Project of The Year 2009
(Jan 2009 – Feb 2009)

Experience:
Doing some inspections of pipeline installation facilities at ENTERPRISE 3 barge which include roller barge setting and roller stinger setting. Also involve in testing of tensioner and Abandoment and Recovery winch capacity which are liaise with PH hydraulic team and validated by PCSB.

Petronas Carigali SDN. BHD. via TL Offshore SDN. BHD.
2009 Transportation and Installation Of Offshore Facilities
DULANG Pipelines Replacement Project
(Dec 2008 - May 2009)

Experience:
Involve in Pipelay Installation analysis/Weld Repair Calculation/A&R analysis/Start-up analysis (Horizontal Bowstring & Vertical Bowstring) for 6inch pipeline 300m replacement length using ENTERPRISE 3 barge.

Carigali PTTEPI OPERATING COMPANY SDN. BHD. via TL Offshore SDN. BHD.
Transportation and Installation Of CPOC Pipelines
(August 2008 – FEB 2009)

Experience:
Involve in Pipelay Installation analysis/Weld Repair Calculation/Sidewalking analysis/A&R analysis/Start-up analysis (Dead Man Anchor and Horizontal Bowstring) for 24inch pipeline from JKA to MDPP platform, 2 of 18inch pipelines from MDC to MDPP platform and 8inch pipeline from MDPP to FSO PLEM. Analysis is based on SAPURA 3000, LEWEK CHAMPION and SEA HORIZON barges.


Petronas Carigali SDN. BHD. via TL Offshore SDN. BHD.
2004-2006 Transportation and Installation Of Offshore Facilities
Angsi Phase IV Development Project
(November 2008)

Experience:
Involve in Riser Installation and davits lift analysis/Spanning analysis for 12inch, 10inch and 6inch pipelines at ANDP-D and ANDR-A platform. Analysis is using ENTERPRISE 3 and LEWEK CHAMPION barges.


PEGASUS OIL & GAS CONSULTANTS SDN BHD, MALAYSIA
(August 2007 – July 2008)

Position : Pipeline and Subsea Engineer

Project Involvement:

Petronas Carigali Vietnam Limited via Malaysian International Shipping Company (MISC Berhad)
Detailed Design For Ruby FPSO PLEM Project
(May 2008 –July 2008)

Petronas Carigali Vietnam Limited (PCVL) is currently operating the Ruby field, which is located in Block 01 and 02 PSC, 155km east of Vung Tau, offshore Vietnam with a water depth of 49m.

Experience:
Involved in PLEM piping stress analysis for both 10inch and 6inch pipes, PLEM structure (Lifting design, Foundation and Settlement Design, Padeye design, Structure analysis, Clamp support design, Valve support design and Anodes design) with interferes all the piping equipment and facilities. Assigned for organize the drawing for submission.

Brunei Shell Petroleum via Petrokon Utama Sendirian Berhad
East Main Oil Line (MOL) Pipeline Replacement Detailed Engineering Design Services
(March 2008 – July 2008)

The main objective of the proposed East Main Oil Line (MOL) replacement project is to install a new PID 2020 24 inch pipeline from CPRP-11 to SAINT-1 and PID 2557 12 inch line from CPRJ-1 to a subsea tie-in to the new PID 2020.

Experience:
Perform the pipeline dropped object analysis, and pipeline onshore analysis. Checking the pipeline design (Wall thickness and On Bottom Stability Analysis).Assigned to control the drawing and design status. Going for site visit at Seria shore approach and attend the weekly project meeting at Petrokon Utama in Brunei.



Brunei Economic Development Board via Pegasus International Sdn. Bhd.
SPM System and Subsea Pipeline Engineering Consultancy Services
(November 2007 – April 2008)

BEDB intends to install a Single Point Mooring (SPM) system and subsea pipeline to facilitate the export of Methanol produced by Brunei Methanol Company Sdn. Bhd. (BMC), a consortium of Mitsubishi Gas Chemical Co. Inc. (MGC), ITOCHU Corporation and Brunei Petroleum Sdn. Bhd.

Experience:
Perform the Stress analysis for onshore pipeline, design the suction pile anchor for Single Point Mooring (SPM) stabilization, and involved in offshore pipeline design (Wall Thickness and Cathodic Protrection Design). Assign to organize the drawing for submission.

Asian Petroleum Development (Glagah Kambuna) Ltd. via PT Klaras Pusaka Internasional
Detailed Design For Kambuna Pipeline Project
(January 2008 – May 2008)

Asia Petroleum Development (APD) is developing the Glagah Kambuna field located approximately 40 km North North East (NNE) of Medan, Sumatera Indonesia, whereby an offshore wellhead platform gas-condensate production will be transported to an Onshore Receiving Facilities (ORF) for the further processing

Experience:
Perform the Stress analysis for onshore pipeline, shore approach analysis and offshore pipeline design which is clad pipe. Assigned to develop the design basis, and organized the drawing for submission.

Petronas Carigali Vietnam Limited via RNZ Integrated (M) Sdn. Bhd:
Conceptual and Basic Engineering Services For Topaz Developmant Project
(November 2007 – January 2008)

PC Vietnam Limited (PCVL) is undertaking development of Topaz field, which is located approximately 164 km from Vung Tau Port, S.R Vietnam in Blocks 01 and 02, with a water depth range from 41m to 50m approximately.

Experience:
Perform the offshore pipeline design (Route selection, On bottom stability, Wall thickness, Riser VIV, Anode design and pipeline installation analysis) and develop the pipeline design basis.

Murphy Sarawak Oil Co., Ltd. (Murphy) via MMC Oil & Gas Engineering Sdn. Bhd: for Murphy Sarawak Development Project (Pipeline Design Services)
(August 2007 – Present)

Murphy Sarawak Oil Co Ltd is developing the Serampang, Merapuh, Golok Barat and Golok Central gas fields offshore Sarawak. The gas pipeline system involves transporting product from the satellite fields to a gas gathering hub located at Golok Central and exporting from Golok Central to a new onshore receiving facility, Murphy Gas Plant 1 (MGP1) northeast of the Malaysian LNG plant near Bintulu (MLNG).

Experience:
Perform the onshore pipeline stress analysis, design of pipe sleepers, pipeline road crossing analysis and also going for site visit to bintulu. Run the clamps design, hanger flange and tie-in flange analysis.


J P KENNY WOOD GROUP SDN BHD, MALAYSIA
(Feb 2005 – July 2007)

Position : Pipeline and Subsea Engineer

Project Involvement:

Murphy Sabah Oil Co., Ltd. (Murphy) and Petronas Carigali Sdn. Bhd. via TL Offshore (Sapura Acergy)
Detailed Design for KIKEH Gas Pipeline
(November 2006 – July 2007)

The Kikeh Development consists of a Floating Production Storage and Offloading vessel (FPSO), which receives production from wells drilled from a wellhead only Dry Tree Unit, located between the Kikeh Field and the Kikeh Kecil Field. The project includes both dry tree and subsea production and water injection wells. All fluids processing occurs on the FPSO. In the future K-5 Fault Block production and water injection wells will be “piggy backed” to Kikeh South.
Experience:
The first of deepwater pipeline design in Malaysia which is involved in PLEM piping stress analysis, PLEM structure (Lifting design, Padeye design, Structure analysis, Clamp support design, Valve support design and Anodes design) with interfere all the deepwater equipment and facilities. Also run the piping stress jumper from PLET to PLEM and PLEM to Subsea tree. Assigned to control the drawing and design status in the scope of Subsea PLEM deepwater structure.

Petronas Carigali Sdn Bhd via RNZ Integrated (M) Sdn. Bhd:
Detailed Engineering Design Services For Labuan Gas Terminal Upgrade (LGAST) and Pipeline Project
(July 2006 – December 2006)

PETRONAS Carigali Sdn Bhd (PCSB) is undertaking the LGAST Project to supply associated gas to a new Petronas Methanol Labuan (PML-2) in Labuan. The new development will include a new gas pipeline from Kikeh field to Labuan Gas Terminal (LGAST), upgrading of the LGAST and a new gas pipeline from LGAST to PML-2 in Labuan. Murphy Oil Corporation (MOC) will supply 120 MMscfd of gas from its Kikeh field, while PCSB’s Sumandak field will supply another 30 MMscfd of gas, to make up 150 MMscfd of gas required by MMP. The development of the offshore pipeline from Kikeh field to LGAST will be implemented by MOC while the rest of the facilities will be implemented by PCSB.

Experience:
Perform the In-place stress analysis for buried pipeline, shore approach analysis and offshore pipeline design. Familiar with launcher and receiver equipment and tie-in analysis to pipelines.

Petronas Carigali Sdn Bhd via MMC Oil & Gas Engineering Sdn. Bhd:
Angsi Phase IV Development Project
(Aug 2006 – October 2006)

Petronas Carigali Sdn Bhd (PCSB) is undertaking the joint development of Angsi D with ExxonMobil Exploration and Production Malaysia Inc (EMEPMI). The field is located offshore Terengganu, Malaysia.

Experience:
Involved in Riser design scope which are includes VIV analysis, and clamp design.


Sarawak Shell Berhad via Ranhill WorleyParsons Sdn. Bhd
Conceptual and Detailed Design for G7 and M3S Subsea Development Project
(March 2006 – June 2006)

The G7 and M3S gas fields are located in the central part of the Central Luconia Province, 230km NW of Bintulu. These fields are developed from existing platform M3 which is located 23 km from G7 and 7.5 km from M3S. These fields are one of the last fields that will produce through the existing M3 complex, prior to foreseen start of M3 decommissioning post 2012.

Experience:
Involved the design of buckle trigger structures, which are includes the lifting, padeye, structure and anode design. Also perform the riser stress analysis and clamps design.

Ministry of Energy, Water and Communication Malaysia via
HLA ASSOCIATES Sdn. Bhd
Pulau Perhentian Water Supply Pipeline
(January 2006 – July 2006)

The project is to provide additional water supply facilities to meet the domestic, commercial and tourism water demand for Pulau Perhentian up to design horizon year of 2015.Presently the island is facing the water shortage immediately to cater of the shortfall of supply and anticipated surge in water demand from tourism industry

Summary of experience:

Involved in offshore and onshore pipeline design and familiar with portable launcher and receiver. Liaise with client, contractor and vendor.

Petronas Carigali Sdn Bhd via RNZ Integrated (M) Sdn. Bhd:
Sumandak Phase 2 Development (Front End Engineering Phase (FEED) and Detailed Design)
(October 2005 – March 2006)
Petronas Carigali Sdn Bhd (PCSB) is undertaking the development of Sumandak field, located in part of the Samarang Sub-Block 6S-18/12 of Samarang Asam Paya PSC about 43 km offshore NW of Labuan Island and 130 km SW of Kota Kinabalu, Sabah. The Sumandak Integrated Development Phase 2 titled “Sumandak Selatan Processing and Gas Platform (SUPG-B), Sumandak Tepi Drilling Platform (SUJT-C) and Interconnecting Pipelines and Tie-ins to Existing Facilities” is planned for first oil in Q4 2007.
Summary of experience:
Perform the offshore pipeline design (Route selection, On bottom stability, Wall thickness, Riser VIV, Anode, Span and Expansion) and develop the pipeline design basis.

Petronas Carigali Sdn Bhd via TL Offshore:
16-inch SMG-A/LGAST Pipelines Replacement (Detailed Design)
(March 2005 – September 2005)
Perform the detailed design of a 52.838km of 16-inch Gas line. A gas platform, SMG-A gathers production gas from SMP-A, SMP-B and SMP-C platforms for export to Labuan Gas Terminal (LGAST) via an 14-inch oil trunk line. PCSB plan to replaced the existing 14-inch gas line from SMG-A to LGAST with a 16-inch pipe.
Experience:
Perform the offshore pipeline design (Route selection, On bottom stability, Wall thickness, Riser VIV, Anode, Span and Expansion) and develop the pipeline design basis.

Sunday, April 26, 2009

Part 5 – Step for Complete the Cycle


The best thing in my life is if I can fight the challenge. I know that to work in contractor are more challenge, more pressure and everthing you deliver need to be fast without produce a problem. Considering on that matters, I’m join one of the biggest Offshore Installation Contractor in Malaysia (TL Offshore Sdn. Bhd.) as a pipeline engineer under engineering team.

In TLO, scopes of works are totally different. In Engineering team you have been shows with all the pipeline installation engineering analysis likes start-up, normal lay, abandonment & recovery, shore approach, mid point tie-in, riser installation, sidewalk, and weld repair.

4 years in pipeline consultant present me the flow of design the pipeline, but the installation is very minimal. For myself, both design and installation need to be balance so that the analysis produce will avoid from any other problem.

In the next part and further, I’ll share all of pipeline design installation scope including reality photo taken at site. And all the pipeline engineers out there if want to include some information either in design or construction are also invited.

Sunday, April 19, 2009

Part 4-New Environment Of Pipeline


Become a good pipeline engineer, at least I must going through the cycle environment of oil and gas. As we noticed, work in pipeline consultant makes you good in doing a paper work especially pipeline design. But,in oil and gas, the scope works is more than expected whereby you need to understanding the design and installation of pipeline are more important.

To realize my journey, I've plan moving to offshore installation contractor (TL Offshore Sdn. Bhd.). But, 3 years experience in consultant is not enough to choose me become a part of them. At the same time I've applying another pipeline consultant like Pegasus International, Intec Engineering and Worley Parson because these are the company who running a lot of overseas project.

After 2 month waiting, finally I join pegasus international as a pipeline engineer. My first target is want to grab the experience as much as I can in that company. At Pegasus, they have 2 overseas project that i'm running which is in Indonesia and Brunei. From outside exposure, I can compare the challenge between project in Malaysia and other oil and gas countries. I'm also want to say a big thanks to my senior like Omar, KAB, Slyvia, Catherine and Zuraini because present me a good step of learning and be confidence for whatever challenge coming.

But, I'm still greedy to find better knowlegde as what I mention before, to join the Offshore Installation Contractor. Then, for about 1 years waiting, TL Offshore accepted my application to become pipeline engineer. The storie will bring you in Part 5

Tuesday, April 14, 2009

Part 3 - Involve In First Deepwater Project


In the end of 2006, after 2 years experience as a pipeline engineer, give me more challenge in the new types of design whereby I've been selected to be part of the team of KIKEH DEEPWATER pipeline project. Say big thanks to Suhaimi Ismail (JPKenny Wood Group Operation Director) because he give me a chance to fulfilled the deepwater team.


Working as a subsea engineer for KIKEH DEEPWATER project, my scope of work is more on the designing the whole of PLEM (Pipeline End Manifold) package. It's not easier to design a PLEM, where you need to understand the flow of content process, piping and structure requirement and also installation at the deepwater region. By guidance from Project Manager (Mr. Chris Carter), Lead Engineer (Ir. David Sze) and Senior Designer (Mashkahawi Sarkam), makes me understand a lot about the project and finally increase my confident level.


Almost 3 years experiences in pipeline which include onshore, offshore and deepwater finding me to a new journey of works and will bring you to Part 4 of the stories.
Conclusion is ;
"doesn't meant you graduate with the average result cannot find you for a better place. Please study your aim in the early stage and set a target for that and I'm so sure you'll find the best place with a better income"


see you in part 4.

Sunday, April 12, 2009

Part 2 – Biggest Challenge in Overseas Company

In JP Kenny, I’ve learned on how to design the pipeline start from scratch. Working with all the old timers pipeline like Ir. Akashah, Ir Lutfi and Ir. David Sze sometimes gave me passion to develop myself in terms of prepared paperwork and communication skills.

Doing a pipeline design are not easy as expected, because as a pipeline engineer, you need to understand the flow of pipeline, where to where, the location, content inside and the most importantly is the technical standard related to who client are you facing currently.

Starting as a fresh graduate engineer is quite difficult because pipeline is totally different from what I’ve learned in university before. Sometimes I’ve spent almost 12-14 hours a day to do a work and make an exercise just to ensure I can understand the flow of pipeline design. Finally, after 4 month joining as a pipeline engineer, I’m ready and have some confident to do it the design.

Hi guys out there especially fresh graduate engineer, if you need some information about oil and gas company or others related, please feel free to ask me in this blog.